Skip to content
Snippets Groups Projects

Fix unit tests

Merged Rodrigo Gonçalves requested to merge rodrigoeg-2.x-patch-9a08 into 2.x

Merge request reports

Merge train pipeline #159023 passed

Merge train pipeline passed for 1a88e673

Approval is optional

Merged by Rodrigo GonçalvesRodrigo Gonçalves 9 months ago (Apr 28, 2024 4:13pm UTC)

Merge details

  • Changes merged into 2.x with 1a88e673 (commits were squashed).
  • Deleted the source branch.
  • Auto-merge enabled

Pipeline passed with warnings for 1a88e673 on 2.x

Activity

Filter activity
  • Approvals
  • Assignees & reviewers
  • Comments (from bots)
  • Comments (from users)
  • Commits & branches
  • Edits
  • Labels
  • Lock status
  • Mentions
  • Merge request status
  • Tracking
Please register or sign in to reply
Loading